update
now we have to make sure that this happens
The
object of the meeting was to discuss how the water levels associated
with the lower areas of the Castlemartin Corse could be better
managed. There was
universal agreement that the current water levels were too high and
ways of providing better drainage would be investigated. The areas to
be considered include the operation of the historical drainage ditches
including the water course and the operation
of the outfall.
I
trust that this conclusion agrees with our discussion which confirmed
your desire for the re introduction of the historical water management
principles.
No comments:
Post a Comment