This is to replace 7 feet deep foundations of stone blocks held together by lead sealed iron clamps
The 600mm plastic pipe is laid on the sand there is no signs of how it is to be connected to the destroyed listed inspection chamber.
The plastic pipe is buried in the pebble banh covered by pebbles not attached to any foundations.
Ending in the pebble bank
THIS IS DESIGNED TO FAIL SO THAT NT CAN SAY WE TRIED AND THEN ABANDON IT (NT OFFICER)
SO DESTROYING THE SSSI WHICH IS EXPENSIVE TO MAINTAIN.
No comments:
Post a Comment