As a temporary measure for one year designed to fail
REPLACE DELIBERATELY DESTROYED OUT FALL
1 meter 500 by 1 meter 500 square opening by a round pipe 600mm in diameter.
THEN THEY WILL DESTROY THE REST TO RETURN THE COAST TO AS GOD INTENDED
1 comment:
I the tunnel is listed then surely planning permission needs to be sought to 'repair' it (lol). Do you know whether this is the case. Also wonder whether there is an individial or organisation who has expertise and who would be willing to help fight this. an article/letter in local newspaper perhaps.
Post a Comment